BBSE3009
Project
Management and Engineering Economics
Project Management at Production and
Construction Stages
1. Building and
Construction
2. Project Plan
3. Building
Contract
4. Contractor
Organisation
[Powerpoint file in PDF
format]
Video Presentation:
Further Reading:
References:
- The Chartered Institute
of Building (CIOB), 2010. Code of Practice for Project
Management for Construction and Development, 4th
ed., Wiley-Blackwell, Chichester, U.K. and
Ames, Iowa. [690.068
C669]
- HKIA, HKICM and
HKIS, 2005. Agreement & Schedule of Conditions of
Building Contract for Use in the Hong Kong Special
Administrative Region: Standard Form of Building Contract:
Private Editon: with Quantities, 2005 ed., Hong Kong
Institute of Architects, Hong Kong Institute of Construction
Managers and Hong Kong Institute of Surveyors, Hong Kong. [692.8095125
A27](* can be read in Moodle)
- Kwakye, A. A.,
1997. Construction Project Administration in Practice,
Chapter 9, Longman, Harlow, Essex. [624.068 K98 c]
- Parsloe, C. and
Wil, L. J., 1998. Project Management Handbook for
Building Services, Building Services Research and
Information Association, Bracknell, Berkshire. [LB 690.068
P96 P]
- Summerhayes, S.
D., 2010. Design Risk
Management: Contribution to Health and Safety,
Wiley-Blackwell, Chichester, U.K. and Ames, Iowa. [690.22 S955
d45]
- Tang, S. L., et
al., 2003. Modern Construction Project Management,
2nd ed., Chps. 1 to 4, Hong Kong University Press, Hong
Kong. [624.068
M689][ebook]
Web Links:
| Created: Aug 2012 |
Update: 6 Feb 2013 | By: cmhui@hku.hk |