| Case Study Index |
shgmun01.jpg 80.65 Kb |
shgmun02.jpg 64.01 Kb |
shgmun03.jpg 59.85 Kb |
shgmun04.jpg 47.52 Kb |
shgmun05.jpg 71.41 Kb |
shgmun06.jpg 56.46 Kb |
shgmun07.jpg 81.36 Kb |
shgmun08.jpg 47.76 Kb |
shgmun33.jpg 110.14 Kb (outdoor leisure pool) |
shgmun34.jpg 107.74 Kb (outdoor leisure pool) |
shgmun09.jpg 60.13 Kb |
shgmun09a.jpg 362.61 Kb |
shgmun09b.jpg 320.59 Kb |
shgmun09c.jpg 376.33 Kb |
shgmun09d.jpg 59.76 Kb |
shgmun10.jpg 116.96 Kb |
shgmun11.jpg 123.04 Kb |
shgmun12.jpg 91.65 Kb |
shgmun12a.jpg 431.06 Kb |
shgmun12b.jpg 430.91 Kb |
shgmun12c.jpg 416.67 Kb |
shgmun12d.jpg 480.38 Kb |
shgmun13.jpg 87.21 Kb |
shgmun14.jpg 107.50 Kb |
shgmun15.jpg 112.90 Kb |
shgmun16.jpg 83.94 Kb |
shgmun17.jpg 80.25 Kb (pool divider) |
shgmun18.jpg 68.51 Kb (movable floor) |
shgmun19.jpg 67.71 Kb |
shgmun20.jpg 78.78 Kb |
shgmun20a.jpg 390.81 Kb |
shgmun20b.jpg 357.57 Kb |
shgmun20c.jpg 380.71 Kb |
shgmun21.jpg 64.18 Kb |
shgmun21a.jpg 404.24 Kb |
shgmun21b.jpg 358.33 Kb |
shgmun21c.jpg 381.09 Kb |
shgmun22.jpg 70.00 Kb |
shgmun22a.jpg 391.79 Kb |
shgmun22b.jpg 351.59 Kb |
shgmun22c.jpg 378.02 Kb |
shgmun22d.jpg 434.31 Kb |
shgmun23.jpg 78.22 Kb |
shgmun24.jpg 69.55 Kb |
shgmun25.jpg 60.10 Kb |
shgmun26.jpg 75.30 Kb |
shgmun27.jpg 37.53 Kb |
shgmun28.jpg 45.96 Kb |
shgmun29.jpg 79.97 Kb (solar panel) |
shgmun30.jpg 52.28 Kb (solar panel) |
shgmun31.jpg 85.65 Kb |
shgmun32.jpg 65.44 Kb |
shgmun35.jpg 90.14 Kb (group photo) |
(a) Indoor Heated Pool
|
(b) Outdoor Leisure Pool
|
(c) Teaching Pool |
Contract period :
1) Construction commenced in Nov.,94 and re-entry in April, 97
2) Completion contract resumed in Sept., 97 and project substantially
completed in October, 98
|
|
|
|
|
Pool Volume |
|
|
|
|
Turnover Rate |
|
|
|
|
Circulation Rate |
|
|
|
|
Circulation Pumps
(cu.m/hr. x no.) |
|
|
|
|
Sand filter |
19.8 m2 |
12.5 m2 |
5.7 m2 |
|
Ozonator |
|
|
|
(max 1.2ppm) |
Reaction Tank |
39.6 cu.m |
20 cu.m |
4.5 cu.m |
|
Carbon Filter |
18.8 cu.m |
9.9 cu.m |
4.5 cu.m |
1.5 min. |
Air Compressor |
|
|
|
sand filter - 7 min. carbon filter - 5 min |
NaOCl Generator |
|
Transformer | : 1500 kVA x 2 nos. |
Standby Generator | : 250 kVA |
General Lighting & Power | : 400 kVA |
HVAC | : 1000 kVA |
Filtration Plant & Hot Water Boiler | : 1250 kVA |
Chillers | 355 kW x 2 | --> | (1) 710 kW | (1) cooling capacity =1250 kW |
Chillers (heat recovery) | 180 kW x 3 | --> | (1) 540 kW | |
Heat Pumps | 213 kW x 3 = 640 kW | --> | (2) 440 kW | (2) Space Heating = 440 kW |
--> | (3) 200 kW | (3) Pool Heating = 800 kW + 330 m2 | ||
Solar Panels | 2 m2 x 168 nos. | --> | total area : 330 m2 | |
Electric Boilers | 300 kW x 2 | --> | (3) 600 kW |
| Case Study Index |
| Created: 18 Jan 99 | Update: 15 Nov 99 | Author: Sam C M Hui
(cmhui@hku.hk) |