SPB5112 Piped Services
Home | What's New | Schedule | Assignments | Laboratory | Resources | Gallery
BSE
Contents
Home page

Related:

  • ibse.hk
  • THEi

  •  
    Welcome to Our Course Website!
    pump-tank
    QF Level: 5
    QF Credit: 12 (one module)
    Pre-requisite: Nil
    Co-requisite: Nil
    Module Aim(s): This module equips students with the abilities to design basic water supply and drainage systems in buildings and develop students’ competence in making relevant decision that complies to engineering requirements on the systems.
    Objectives: On completion of this Module, students are expected to be able to:
    1. design, operate and maintain basic systems for water supply and drainage services in buildings;
    2. evaluate the system performance and provide solutions for system improvements; and
    3. link fundamental knowledge with practical design and make rational system choices related material and equipment selection.
    Assessment Methods: • Coursework (30%)
    • Examination (70%)
    Course Website: http://ibse.hk/SPB5112/


     


    | Created: Sep 2017 | Update: 29 Jan 2018 |